Skip to product information
1 of 12

FriskyFizzyArts

Custom 3D Head Model: VFX Artist Topology for Animation, Cosplay(Digital Download)

Custom 3D Head Model: VFX Artist Topology for Animation, Cosplay(Digital Download)

Regular price $450.00 CAD
Regular price Sale price $450.00 CAD
Sale Sold out
Shipping calculated at checkout.
Quantity

✨ This DEMO listing Please Message me for custom requirement before buying !!!
✨ Custom 3D Model from Portrait from Your Photo

I’m a Senior Character & Creature Artist with 17+ years of experience in VFX films and games development, now offering custom 3D modeling services for individuals, cosplayers, and digital creators.

With my expertise, your photo will be transformed into a high-quality 3D head model with clean topology, suitable for animation, 3D printing, and digital design.

✔️ What You’ll Receive:

A 3D head model built from your photos (minimum 3 angles required: front, side, ¾ view).More photos from different angle the better

Professional-grade topology designed for animation, rigging, and further sculpting.

Delivery in popular formats (OBJ, STL, FBX, ZTL).

Preview renders of your 3D head model before delivery.

✔️ Why Choose Me:

I bring over 17 years of experience working in top VFX studios and game projects, crafting characters and creatures at industry standards.

Models are created with production-level accuracy and clean geometry flow, ensuring they’re animation-ready
Your model will be made with the same attention to detail as professional film and game assets.

✔️ Perfect For:

Cosplayers → test helmet fits and mask designs digitally.

Animators & Game Devs → ready-to-rig base mesh with proper loops.

Digital creators → avatars for VR, AR, and 3D platforms.

✔️ How It Works:

Place your order.

Send me 3–5 photos (front, side, and ¾ angles, clear lighting).

I create a custom 3D head model based on your images.

You receive finished files ready to use in animation, 3D printing, or design.

This is a custom digital service (no physical product will be shipped).

View full details