FriskyFizzyArts
Custom 3D Head STL for 3d Print
Custom 3D Head STL for 3d Print
Couldn't load pickup availability
This DEMO listing Please Message me for custom requirement before buying !!!
I’m a Senior Character & Creature Artist with 17+ years of experience in VFX films and games development, now offering custom 3D modeling services for individuals, cosplayers, and digital creators.
With my expertise, your photo will be transformed into a high-quality 3D head model with clean topology, suitable for animation, 3D printing, and digital design.
✔️ What You’ll Receive:
A 3D head model built from your photos (minimum 3 angles required: front, side, ¾ view).More photos from different angle the better
Professional-grade topology designed for animation, rigging, and further sculpting.
Delivery in popular formats (OBJ, STL, FBX, ZTL).
Preview renders of your 3D head model before delivery.
✔️ Why Choose Me:
I bring over 17 years of experience working in top VFX studios and game projects, crafting characters and creatures at industry standards.
Models are created with production-level accuracy and clean geometry flow, ensuring they’re animation-ready
Your model will be made with the same attention to detail as professional film and game assets.
✔️ Perfect For:
Cosplayers → test helmet fits and mask designs digitally.
Animators & Game Devs → ready-to-rig base mesh with proper loops.
Digital creators → avatars for VR, AR, and 3D platforms.
✔️ How It Works:
Place your order.
Send me 3–5 photos (front, side, and ¾ angles, clear lighting).
I create a custom 3D head model based on your images.
You receive finished files ready to use in animation, 3D printing, or design.
This is a custom digital service (no physical product will be shipped).
Share
